Chaozhou City, Xiangqiao District, 2017 New Distribution Network Construction Supervision

This tender project Chaozhou City Xiangqiao District 2017 new distribution network project construction supervision (project name) has been Guangdong Power Grid Co., Ltd. (project approval, approval or filing of the name of the project) to tide power meter [2016] No. 73, tidal power meter [2016] No. 76 was approved for construction. The project construction unit is Chaozhou Power Supply Bureau of Guangdong Power Grid Co., Ltd. The construction funds are its own funds and bank loans. The bidder is Chaozhou Power Supply Bureau of Guangdong Power Grid Co., Ltd. The project has already met the conditions for bidding. The construction supervision of the project is now open for public bidding.

2. Project overview and scope of tender
2.1 Construction site: Xiangqiao District, Chaozhou City.
2.2 Scale of Construction: Supervision of new distribution network construction in 2017 in Xiangqiao District, Chaozhou City. Chaozhou District, Xiangqiao District, 2017 infrastructure distribution network project, including regular projects, expansion support for the low-voltage distribution network industry and tight (should) emergency project construction supervision. In the implementation of the project, if an individual project cannot be constructed because of objective reasons, the construction unit has the right to adjust the project, and the adjustment project is still under the supervision of the successful bidder. See tender documents for details.
2.3 Schedule duration: 501 calendar days, planned start date: February 15, 2017, scheduled completion date: June 30, 2018. (The actual construction period is based on the start-up report and the completion report)
2.4 Bidding scope: Supervision of the entire process of survey and design, construction preparation (including three links and one leveling), construction, completion settlement, defect liability period, and electronic transfer. Use the project information management system as required by the construction unit. (For details, see the tender documents).
2.5 Division of tenders: The tender for this project is divided into 1 bid section. (For details on the division of tenders, see the tender documents).
3. Bidder qualification requirements
3.1 It has an independent legal personality and holds a valid legal business license.
3.2 Qualification requirements: Qualified with engineering supervision qualifications or power engineering supervisors Grade B and above.
3.4 Financial requirements: No requirements.
3.5 Performance Requirements: No requirements.
3.6 Credit requirements: No requirements.
3.6 Requirements of the Chief Supervising Engineer: Obtained the registered supervising engineer's practicing certificate, registered in the bid application registration unit.
3.7 Credit Requirement: The government of the project, China Southern Power Grid Co., Ltd. and Guangdong Power Grid Co., Ltd. have no penalties for restricted bidding.
3.8 Consortium bids are not accepted.
3.9 Other: The IC card has been submitted for bid in Guangzhou, and the engineer intending to serve as the director of this project must be a registered employee of the company (IC card).
4. Bid registration and access to bidding documents
4.1 From December 30, 2016 to January 6, 2017, daily from 09:30 to 11:30, and from 14:00 to 16:00 (Beijing time, the same below)

Ni-Fe Battery 100~200ah

Nickel Alkaline Battery,Solar Energy Battery,48V Nife Battery 200Ah ,Ni-Fe Battery 100~200Ah

Henan Xintaihang Power Source Co.,Ltd , https://www.taihangbattery.com