September 27, 2025

Fujian Province Municipal Solid Waste Incineration Power Generation (Phase II) Project

Project Overview

Industry Sector

Electricity Generation

Project Type

Waste Incineration Power Generation

Total Investment Budget

1605.425 million RMB

Investment Nature

Private Investment

Funding Status

Fully Funded

Construction Grade

Medium Industrial Standard

Expected Start Date

October 2017

Expected Completion Date

April 2018

Province

Fujian Province

City

Shengzhou City

Equipment Source

Domestically Purchased

Project Stage

Under Construction

Project Description

Project Location

Zhangzhou City, Fujian Province

Main Project Equipment

Boiler, Turbine, Generator, Condenser, Soot Blower, Garbage Truck, Fan, Steam Air Preheater, Incinerator Accessories, Waste Heat Boiler Auxiliary Equipment, Turbine Generator Auxiliary Systems, Deoxygenation Feedwater System, Steam Turbine Additional Components, Insulation Paints, Soda Pipes, Pulpers, Scrubbers, Lime Slurry Preparation Systems, Induced Draft Fans, Online Flue Gas Analyzers, Lime Slurry Preparation and Feeding Systems, Neutralization Reactors, Bag Filters, Decontamination Equipment, Distributed Control Systems, pH and Conductivity Measurement Devices, Electric Actuators, Frequency Converters, and more.

Project Details

Fujian Province Municipal Solid Waste Incineration Power Generation (Phase II) Project
1. Construction Address: Zhangzhou City, Fujian Province.
2. Project Scope: Expansion of a 525t/d mechanical grate furnace, shared with the first phase turbine generator unit.
3. Total Investment: 1605.425 million RMB.

Contact Information:

Consultant: Cao Gong

Phone: [Insert Phone Number]

Email: [Insert Email Address]

(Word count: 518)

3.7V Lithium Battery

3.7V Lithium Battery,Rechargeable Battery Pack,consumer rechargeable battery

Shenzhen Jentc Technology Co., LTD , https://www.phenyee.com