Project Overview Industry Sector Electricity Generation Project Type Waste Incineration Power Generation Total Investment Budget 1605.425 million RMB Investment Nature Private Investment Funding Status Fully Funded Construction Grade Medium Industrial Standard Expected Start Date October 2017 Expected Completion Date April 2018 Province Fujian Province City Shengzhou City Equipment Source Domestically Purchased Project Stage Under Construction Project Description Project Location Zhangzhou City, Fujian Province Main Project Equipment Boiler, Turbine, Generator, Condenser, Soot Blower, Garbage Truck, Fan, Steam Air Preheater, Incinerator Accessories, Waste Heat Boiler Auxiliary Equipment, Turbine Generator Auxiliary Systems, Deoxygenation Feedwater System, Steam Turbine Additional Components, Insulation Paints, Soda Pipes, Pulpers, Scrubbers, Lime Slurry Preparation Systems, Induced Draft Fans, Online Flue Gas Analyzers, Lime Slurry Preparation and Feeding Systems, Neutralization Reactors, Bag Filters, Decontamination Equipment, Distributed Control Systems, pH and Conductivity Measurement Devices, Electric Actuators, Frequency Converters, and more. Project Details Fujian Province Municipal Solid Waste Incineration Power Generation (Phase II) Project Contact Information: Consultant: Cao Gong Phone: [Insert Phone Number] Email: [Insert Email Address] 3.7V Lithium Battery,Rechargeable Battery Pack,consumer rechargeable battery Shenzhen Jentc Technology Co., LTD , https://www.phenyee.com
1. Construction Address: Zhangzhou City, Fujian Province.
2. Project Scope: Expansion of a 525t/d mechanical grate furnace, shared with the first phase turbine generator unit.
3. Total Investment: 1605.425 million RMB.