May 07, 2024

2017 Maintenance of Single Well Hydrogen Sulfide Elimination Unit for Heavy Oil Companies in 2017 (Tender Announcement)

Project Name Maintenance of H2S Elimination Unit for Single Well in 2017

Item Number-XJYT-0012862
I. Tender conditions
This service project has fulfilled the relevant approval and filing procedures as required. The funds have been implemented and the tendering conditions are met.
II. Overview and scope of tender
(1) Project Overview: In order to protect the personal safety of employees against hydrogen sulfide hazards, the single well hydrogen sulfide elimination device in the area under the jurisdiction of the heavy oil company must be maintained, and the spent chemicals should be promptly replaced to ensure the normal use of the device and ensure the safety of the employees. (2) Construction site: Heavy oil development company oil zone (3) Duration: From January 1, 2017 to December 31, 2017 (4). See the tender document ZY-2017-039 for detailed information.
Hydrogen sulfide elimination device maintenance for single wells in 2017 under the jurisdiction of heavy oil companies
III. Bidder qualification requirements
1. This bid does not accept the Consortium bid; 2. The tender requires qualification requirements of the bidder: The service scope granted by the Xinjiang Oilfield Market Access Permit is the oil well sulfur and sulfur removal technology service, and the Xinjiang Oilfield Company HSE access permit. Pharmacy possesses the company's product quality accreditation certificate; 3. The tender requires the bidder's financial status to be good in the past three years; 4. The bidding requires that the bidder has similar project performance in the past three years; 5. The tender requires the bidder to have a good The social reputation of the company is that there are no lawsuits; 6. The bidding requires that the bidder must have a market access certificate for PetroChina Xinjiang Oilfield Company that is effective and compatible with this project and access to HSE of PetroChina Xinjiang Oilfield Company. There are no major quality and safety accidents in the past three years. 7. The prequalification is not used in this tender. 8. The bidder must study the matters in the bidding documents in detail and participate in the bidding according to the capabilities of the unit.
IV. Acquisition of tender documents
Bidding Document Release Date: November 11, 2016 10:00:00