Tender Number: 2017FWGK3772 First, the Tender Conditions The project has completed all necessary approval and filing procedures as required by the relevant authorities. The funding source is fully secured, and all conditions for conducting a tender have been met. An open tender process is now being initiated. II. Project Overview and Scope of Tender 2.1 Project Name: 2018 Geophysical Prospecting Company Xinjiang Last Earthquake Production Equipment and Material Transportation Service Project; 2.2 Tender Number: 2017FWGK3772; 2.3 Estimated Investment: RMB 3.7 million (including tax); 2.4 Service Period: January 15, 2018, to December 31, 2018; 2.5 Implementation Location: Qiemo County, Xinjiang; 2.6 Scope of Tender: The provision of desert equipment and production materials for earthquake-related operations in Xinjiang and the last block. The project requires five flatbed trucks for transporting desert equipment and three trailers for carrying bentonite and other production materials. For detailed information on the scope of the tender, please refer to Chapter 4 “Technical Standards and Requirements†in the bidding documents with tender number 2017FWGK3772. 2.7 This is a framework agreement tender, with two bidders involved. The workload will be divided in a 60% to 40% ratio. III. Qualification Requirements for Bidders 3.1 This project does not accept bids from consortiums; 3.2 The bidder must be a legally registered entity or organization, with a valid business license that includes general cargo transportation in its business scope; 3.3 Bidders are required to hold the “Road Management Permit†and demonstrate sufficient capabilities in terms of personnel, equipment, and financial resources. Specifically, the proposed project manager must have more than three years of experience managing similar projects, while the technical supervisor must have at least two years of experience in related fields. IV. Acquisition of Bidding Documents 4.1 Bidding documents can be obtained from December 14, 2017, at 9:00 AM Beijing Time, until December 20, 2017, at 11:59 PM Beijing Time. Bidders are encouraged to review all requirements carefully and submit their proposals within the specified timeframe. Further details regarding the evaluation criteria and submission procedures will be included in the official bidding documents. Any inquiries should be directed to the designated contact person as stated in the tender notice. The CCP1000 series high-voltage power supply module is a single-phase 220Vac input modular high-voltage power supply. The whole series adopts unified small and compact aluminum chassis with the designed output power at 1KW, and the output voltage levels at 5KV / 10KV / 20KV / 30KV / 40KV / 50KV for selection.
High Voltage Module,High Voltage Power Module,High Voltage Booster Module,High Voltage Power Supply Module Yangzhou IdealTek Electronics Co., Ltd. , https://www.idealtekpower.com
The HV power module is also equipped with a DB9 interface to facilitate the bus control of embedded installation equipment. Customers can apply 0-10V signals and dry contact signals to the interface according to our interface definition to achieve comprehensive control and monitoring functions on the power supply, like high voltage start / stop, output setting and reading.
The CCP1000 high voltage power modules are equipped with complete protection functions, which can deal with sparking, short-circuit, and overload conditions. With the discharge protection circuit recommended by iDealTek-Electronics, the high-voltage module can also cope with conventional capacitor charging and discharging conditions.
At present, the high voltage power modules are mainly used in air or oil fume purification, capacitor charging and other application fields that require a high-voltage power module that can be embedded installation.